Our Projects
Customer: “TEMIRZHOL KURYLIS ATYRAU” LLP
Project: «Preliminary works for construction of railway loading works on West Eskene, Agip KCO, Karabatan.
Work performance period: 08.2008-07.2009
Scope of work: Technological support in construction of the facility “Earth works”.
Performed services:
- Compilation of matrix (Matrix of required documentations for construction activities, construction progress and commissioning).
- Checking hidden work acts for compliance with SNiP, earth, concrete work logs, author’s supervision log, general work log.
- Checking of compliance of performed works on approved projects with the RoK norms and standards.
- Checking of passports and certificates, test results, conclusions, test protocols and laboratory analysis availability for the applied materials and goods, and compliance with the state standards and technical conditions.
- Support and work with the planned and unplanned inspections of supervisory authorities on the construction site.
________________________________________________________________________________________________________
Customer: “CASPIAN PROGER ENGINEERING & CONSULTING” LLP
Project: «New Agip KCO headquarters in Atyrau city»
Work performance period: 01.2009 – 31.05.2009
Scope of work: Additional designing and approval of the project.
Performed services:
- Design adaptation.
- Development of an Environmental Impact Assessment.
- Approval with the Department of Architecture and Town Planning.
- Project approval with the interested organizations.
Project: “Pile works of new Agip KCO office complex ”
Work performance period: 02.2009 – 31.03.2009
Scope of work: Project development. Obtaining of conclusion in “Gosexpertiza” on pile works.
Performed services:
- Explanatory note development.
- Design checking to compliance with the regulatory norms and standards of RoK (adaptation).
- Approval of the general layout plan with the Fire Fighting Service.
- Project approval with the RSE “Gosexpertiza”.
Project: “Koshanai Waste Management Facility” Tyubkaragan district, Mangistau oblast.
Work performance period: 04.2009 – 12.2012
Scope of work: Designing and approval of the facility «Koshanai Waste Management Facility”.
Performed services:
1. Design adaptation in compliance with the RoK rules and standards (development of an explanatory note and General Layout development);
2. Design coordination and approval with:
- Emergency department of Mangistau oblast;
- State fire department of Mangistau oblast;
- State sanitary Supervisions of Mangistau oblast;
- Mangistau oblast ecology department;
- ZhaikCaspiyskiy department of ecology;
- RoK Ministry of Environment.
3. Design State expertise in the ASE “Mangistaugosexpertisa”.
________________________________________________________________________________________________________
Project: Construction of export oil pipeline for Agip KCO
Work performance period: 07.2008 – 06.2010
Scope of work: Technological support of construction proccess.
Performed services:
1.Compilation of matrix (Matrix of documentation required for construction activities, construction progress and commissioning)
2.Technical expertise of an as built documentation on this project (checking of hidden work acts for compliance with SNiP, earth, concrete work logs, author’s supervision log, general work log);
3. Check of compliance of performed work on approved projects for RoK norms and standards.
4. Control of passports and certificates, test results, conclusions, test protocols and laboratory analysis availability for the applied materials and goods, and compliance with state standards and technical conditions.
5. Support and work with planned and unplanned inspections of supervisory authorities in the construction site.
________________________________________________________________________________________________________
Project: “Kashagan Field Development Experimental Program. Onshore complex. OPF. Temporary evacuation helipads”, Insite roads”. Temporary refuge for personnel”. “OPF Road lighting”. “Kashagan Field Development experimental program” Accommodation camp. Agip KCO. Transformer substation 35/10kW Utility area”
Work performance period: 15.03.2010 – 31.12.2010
Scope of work:
Development and adaptation of the detail design.
Approval of the technical project documentation with the state supervisory authorities.
Analyzing the existing project documentation on plant facilities area.
Performed services:
- Detail design development and adaptation
- Obtaining a conclusion from the state expertise agency.
- Technical project documentation approval with the following state authorities:
- Emergency department of Atyrau oblast;
- Department of Sanitary epidemiological Supervision on Atyrau oblast;
- ZhaikCaspiyskiy department of ecology.
Project: “Agip KCO Temporary offices TCO 5, 6”, “Agip KCO Temporary office TCO 7”
Work performance period: 18.08.2010 – 01.03.2011
Scope of work: Design development. TPD approval with the State authorities.
Performed services:
1. Detail design development.
2. Obtaining a conclusion of state expertise.
3. Technical project documentation approval with the following state authorities:
- Emergency department of Atyrau oblast;
- Department of Sanitary epidemiological Supervision on Atyrau oblast;
- Zhaik Caspiyskiy department of ecology
4. Obtaining a permit for Construction and assembly works from local agency of state architecture and construction supervision.
Project: “Drill cutting re-injection on EPC-3”
Work performance period: 01.10.2010 – 28.02.2011
Scope of work: Consulting services. Design approval.
Performed services:
- Consulting services.
- Design approval with the interested state authorities.
- Author’s Supervision.
Customer: “ABE & K” LLP
Project: “Residential complex Zheruik 5-storied 25 residential houses ”
Work performance period: 12.2015-up to present time
Scope of work: Project development and coordination.
Performed services:
1.Initial project preparation
2.Working design development
3. Receive positive opinion by state expertise
4.Coordination of technical project documentation by the next interested governmental agencies:
– Emergency department of Atyrau oblast
-Sanitary-epidemiological supervision department of Atyrau oblast
– Ecology department
4.Obtaining permits for construction and installation works from local agency
Project: “Agip KCO Temporary offices TCO 8, 10”, “Agip KCO Temporary office TCO 9”
Work performance period: 13.01.2011 – 13.04.2011
Scope of work: Design development and approval.
Performed services:
1. Pre-design works;
2. Detail design development.
3. Obtaining a conclusion of the state expertise.
4. Technical project documentation approval with the following state authorities:
- Emergency department of Atyrau oblast;
- Department of Sanitary epidemiological Supervision on Atyrau oblast;
- Zhaik Caspiyskiy department of ecology
5. Obtaining a permit for Construction and assembly works from local agency of state architecture and construction supervision.
Project: “Adjustment of the Bautino base design. Collection of initial data for EIA development”
Work performance period: 05.04.2011 – 30.06.2011
Scope of work: Adjustment of the Bautino base design. Collection of initial data for EIA development.
Performed services:
- Adjustment of the Bautino base design.
- Collection of initial data for EIA development.
Project: «Adjustment of the Koshanai design. Collection of initial data for EIA development”
Work performance period: 05.04.2011 – 30.06.2011
Scope of work: Adjustment of the Koshanai design. Collection of initial data for EIA development
Performed services:
- Adjustment of the Koshanai design.
- Collection of initial data for EIA development.
Project: “Adjustment of the Agip KCO Training centre. Collection of initial data for EIA development”
Work performance period: 05.04.2011 – 30.06.2011
Scope of work: Adjustment of the design. Collection of initial data for EIA development.
Performed services:
- Adjustment of the Agip KCO Training centre design.
- Collection of initial data for EIA development.
Project: HARRAN helicopter refueling station FA 0038 on helideck “KE-F” on the A- Island. Kashagan field.
Work performance period: 30.06.2011 – 31.08.2011
Scope of work: Designing, permitting, approval, technical and author’s supervision services.
Performed services:
1. Pre-design works;
2. Detail design development.
3. Obtaining a state expertise conclusion.
4. Technical project documentation approval with the following state authorities:
- Emergency department of Atyrau oblast;
- Department of Sanitary epidemiological Supervision on Atyrau oblast;
- ZhaikCaspiyskiy department of ecology.
5. Obtaining a construction permit from local agency of state architecture and construction supervision.
6. Technical Supervision of the project.
7. Author’s Supervision over the project.
Project: «Development of the detail design for preparation of the Bautino Base uncultivated area, Agip KCO»
Work performance period: 03.02.2012 – 13.02.2012
Scope of work: Design development and approval.
Performed services:
- Pre-design works.
- Detail design development.
- Obtaining a conclusion of state expertise.
- Technical project documentation approval with the following state authorities:
- Department of Sanitary epidemiological Supervision on Atyrau oblast;
- Zhaik-Caspiyskiy department of ecology.
Project: “LLP DCS Administrative building with parking”
Work performance period: 18.01.2012 – 13.09.2012
Scope of work: Designing, Permitting, Approval, Author’s and Technical supervision services
Performed services:
1. Pre-design works.
2. Detail design development.
3. Obtaining a state expertise conclusion.
4. Technical project documentation approval with the following state authorities:
- Emergency department of Atyrau oblast;
- Department of Sanitary epidemiological Supervision on Atyrau oblast;
- Zhaik-Caspiyskiy department of ecology
5. Technical Supervision of the project.
6. Author’s Supervision over the project.
Project: Helicopter refueling station on helideck “Zhuldyz” on the EPC-4 artificial Island. Kashagan field.
Work performance period: 05.10.2012 – 08.01.2013
Scope of work: Designing, permitting, approval, technical and author’s supervision services.
Performed services:
1. Detail design development.
2. Obtaining a state expertise conclusion.
3.Technical project documentation approval with the following state authorities:
- State architecture and construction supervision;
- Emergency department of Atyrau oblast;
- Department of Sanitary epidemiological Supervision on Atyrau oblast;
- Department of ecology.
4. Obtaining a construction permit.
5. Technical Supervision of the project.
6. Author’s Supervision over the project.
________________________________________________________________________________________________________
Customer: «PUNJ LLOYD KAZAKHSTAN» LLP
Project: «Agip KCO Kashagan Field Development Experimental Program – EPC for export oil pipeline»
Work performance period: 24.10.2011 – 14.11.2011
Scope of work: Expert services in the field of industrial safety. Technical documentation preparation and support for permitting on the project.
Performed services:
- Expert services in the field of industrial safety, provision of conclusion on the revised project documents on export oil pipelines.
- Expert services in the field of industrial safety, provision of conclusion on the revised project documents on export gas pipelines.
- Preparation and support of technical documentation for getting approval of the project from authorized agencies.
________________________________________________________________________________________________________
Customer: “AKER SOLUTIONS CONTRACTING AS, KAZAKHSTAN”
Project: “Kashagan Field Development Experimental Program. Hook-up and Commissioning of Complex D and island A Offshore Facilities»
Work performance period: 01.06.2010 – 31.12.2011
Scope of work: Provision of consulting services in the field of industrial safety, metrology, fire safety and obtaining of approval from the state regulatory authorities.
Performed services:
Collection and compilation of permitting documentation for launching and exploitation of Kashagan project facility;
- identification and checking of all permits, licenses, approvals necessary for contractor to ensure the compliance with RoK norms;
- expert services in the field of industrial safety for technologies, technical equipments, materials, used in this industrial facility;
- to develop a matrix of permits, licenses, approvals and consents;
- monitoring changes in regulations and standards, preparation of reports on regular basis as per the prospective changes, that might affect the permitting and certification process regarding commissioning of the Kashagan project;
- identification of all relevant certification requirements applicable to the project;
- development of a certification strategy and plan;
- monitoring and verification of the presence and compliance of certificates with acting law;
- develop a strategy for metrology and prepare a plan for the metrology certification;
- implementation of all the necessary work for metrological certification of the measuring devices;
- analysis of the manufacturer’s documentation, conducting calibration of tools and document preparation;
- work with state metrology and inspection authorities for obtaining approvals;
- data base maintenance for obtained certificates of type, metrological certificates, certified items and calibration certificates.
________________________________________________________________________________________________________
Customer: “SAIPEM KAZAKHSTAN BRANCH”
Project: “Kashagan Field Experimental Development Program. Offshore Complex. Construction of drilling production island and oil procurement EPC-2 on D block”
Work performance period: 03.2012 – up to present time
Scope of work: Development and Approval of Technical project design for construction of Accommodation block/ RIG 5946. Author’s Supervision during the construction period.
Performed services:
1. Development and approval of the detailed design to comply with technological-normative documentation, sanitary-hygienic norms and laws of RoK based on manufacturer’ drawings.
2. Coordination and approval by the following state authorities:
- Atyrau region SES;
- Atyrau region Firefighting service (Emergency Department);
- Obtaining an architectural planning assignment from the architecture and town planning department;
3. Obtaining a State expertise conclusion for the detailed design.
4. Author’s supervision during the construction.
Project: “Kashagan Field Experimental Development Program. Offshore Complex. Construction of drilling production island and oil procurement EPC-2 on D block.”
Work performance period: 08.2010 – 09.2010
Scope of work: Technical Supervision services for construction of the accommodation block/rig 5946, EPC-2 Island.
Performed services:
- Carry-out the activities to complete design tasks and commissioning in accordance with the scheduled dates.
- Provide technological order schedule supervision while construction-installation works are being done on the site.
- Obtaining all technical documentations for construction.
- Participating in the commissioning and acceptance of the completed facilities, particular stages and complex of the jobs and installed facilities.
Project: “Kashagan Field Experimental Development Program. Offshore Complex. Construction of accommodation block/ rig 5947 on EPC-4 island”
Work performance period: 20.03.2012 – 21.06.2012
Scope of work: Provision of Development and Adaptation services, Technical and Author’s Supervision.
Performed services:
- Collection of initial data.
- Obtaining an Architectural Design Assignment from Architecture and Town Planning Department of Atyrau oblast;
- Development of TPD in compliance with the RoK legislation and standards;
- Adaptation of “Zhuldyz” Living Quarter technical documentation.
- Development of the Environment protection part of TPD;
- Coordination of the process of approval obtaining of RoK State authority approvals on the designing documentation.
- Obtaining of State expertise conclusions.
- Author’s Supervision services for construction;
- Technical Supervision services for construction.
________________________________________________________________________________________________________
Customer: “CASPIAN ENGINEERING AND RESEARCH” LLP
Project: “Kashagan Field Experimental Development Program. Offshore Complex. Process Construction”
Work performance period: 01.07.2011- 31.12.2011
Scope of work: Design adjustment with starting-up complexes.
Performed services: Design adjustment.
Project: “Kashagan Field Experimental Development Program. Offshore Complex. Process Construction”
Work performance period: 01.07.2011 – up to the present time.
Scope of work: Author’s Supervision over the project.
Performed services:
- Design solution compliance control.
- Construction term compliance control
- Control over the quality of the construction works.
- Control over execution by the building company of instructions, requirements set by the state authorities.
- As built documentation filling in, accuracy control (general work log, author’s supervision log, welding log, earth work log, etc) including the acts, as built diagrams, etc.
- Provisional control of performed work.
Project: “Kashagan Field Experimental Development Program. Offshore Complex. Process Construction”
Work performance period: 01.01.2012 – 31.03.2012
Scope of work: Approval of the project correction.
Performed services:
- Participation in obtaining the approvals for the project correction.
- Report preparation on the possible expertising agency comments.
Project: Kashagan Field Experimental Project Development. Railway complex. West Eskene.
Work performance period: 14.09.2012 – up to the present time
Scope of work: Author’s supervision
Performed services:
- Design solution compliance control.
- Construction term compliance control.
- Control over the quality of the construction works.
- Participation in the acceptance together with the technical supervision service of the client for critical facilities and the main hidden works types.
- Joint participation with the technical supervision in composing hidden works acts by other following works and structures.
- Participation in testing and acceptance of separate systems into operation.
- Checking the compliance of certificates, passports and other documentation for structures, parts and construction materials and equipments with the state standards, specifications and design estimate documentations.
________________________________________________________________________________________________________
Project: “Kashagan Field Development Experimental Program”
Work performance period: 16.11.2011 – 05.12.2011
Scope of work: Provision of the works on assessment and expertise of the methanol dosing tank for using as a temporary methanol storing tank capacity during pre-commissioning in the OPF.
Performed services:
- Preparation of recommendations on using the dosing tank as a temporary methanol storing capacity.
- Provision of expert services and issue of expert conclusion in the field of industrial safety.
- Control over compliance with the RoK regulations.
- Obtaining of permitting documentation.
Project: “Kashagan Field Experimental Development Program”
Work performance period: 21.11.2011 – 21.12.2011
Scope of work: Development of regulation for gas service and departmental control organization on safe operation of gas facilities in compliance with the Industrial Safety Requirements for Natural Gas Distribution and Consumption Systems. Obtaining a license.
Performed services:
- Provision of expert services and issue of expert conclusion in the field of industrial safety.
- Obtaining a license for the following activities:
- Operation, maintenance and sustention of external gas supply systems (gas distribution points, gas distribution units, HP, MO and LP gas distribution networks)
- Operation, maintenance and sustention of internal gas networks, gas appliances and equipment.
Project: “Kashagan Field Experimental Development Program.”
Work performance period: 09.01.2012 – 09.02.2012
Scope of work: Obtaining the Permit to Use for sheet and round piles.
Performed services:
- Documentation preparation.
- Issuing of expert conclusion and obtaining the Permit to Use in the field of industrial safety.
Project: “Kashagan Field Development Experimental Program”
Work performance period: 01.01.2012 – 31.08.2012
Performed services:
- Development of the detailed matrix and registers on offshore complex as built documentation.
- Conducting and documenting operation control of construction and assembly works.
- Executing and documenting hidden works certification, provisional acceptance of critical structures and equipments in order, established by the design documentation.
- Preparation of documentation package on offshore facilities, required for object submission to commissioning.
- Meeting the requirements of local executive agencies on turnover documentation maintenance.
- Dossier completing on as built documentation by sub-systems for submission to state acceptance commission.
Project: “Kashagan Field Experimental Program Development. Eskene West Railway Project, Sulphur Pastillation and Shipment Complex. Book 1”
Work performance period: 20.02.2012 – 20.05.2012
Scope of work: Verification of design documentation (stage D), including the explanatory note, design sections and all drawings. Consulting support during the design approval
Performed services:
- Verification of design documentation (explanatory note, design sections and all drawings).
- Issuance of comments on this project.
- Consulting support during the design approval.
Project: “Kashagan Field Experimental Program Development”
Work performance period: 01.08.2012 – 02.10.2012
Scope of work: Obtaining a permit to use for the technology “Leakage test with Nitrogen/helium for 1 hour duration”
Performed services:
- Collection, compilation and preparation of documentation.
- Provision of expert services and issue of expert conclusion in the field of industrial safety.
- Obtaining the Permit for usage from the RoK Ministry of emergency situation.
Project: “Kashagan Field Experimental Project Development. Onshore site.OPF. Amendment. Mercury Removing unit project”
Work performance period: 08.08.2012 – 08.12.2012
Scope of work: TPD development for Mercury Removing unit and getting approvals from the state supervisory authorities
Performed services:
1. Pre-design works.
2. Detail design development.
3.Technical project documentation approval with the following state authorities:
- Emergency department of Atyrau oblast;
- Department of Sanitary epidemiological Supervision on Atyrau oblast;
- Department of ecology.
4. Obtaining a positive state expertise conclusion, Astana.
Project: Kashagan Field Development Experimental Program. Onshore site. Unit 620. Amendment (Transit plan to recycling water supply. Phase 1)
Work performance period: 22.04.2013-23.05.2013
Scope of work: Provision of design assessment and design validation in the field of industrial safety.
Project: “West Eskene rotational village for 1000 seats”
Work performance period: 27.03.2013-28.06.2013 UNCOMPLETED
Scope of work: Design adjustment
Performed services: Adjustment of design with all required examination, and obtaining of approval with regulatory agencies and state expertise conclusion as well.
Project: Power supply expert review and obtaining of permanent approval for connection with electric instalaltions active networks of the following projects: OPF 1, 2 and 3 tranche, Process liquid waste disposal area, Sulphur warehouse, Export oil pipeline, Export gas pipeline, Trunk lines, Fuel gas lines and Chemical laboratory.
Work performance period: 30.04.2013-30.06.2013 UNCOMPLETED
Scope of work: Provision of power supply expert review and obtaining of approval with regulatory agencies.
Project: Author’s Supervision during the construction of development wells on EPC-4 of the Kashagan Field. Wells ВК 04-01 – ВК 04-07 on EPC-4.
Work performance period: 01.07.2013-31.12.2013
Scope of work: Provision of Author’s Supervision
Project: West Eskene Railway Complex project
Work performance period: 01.07.2013-31.01.2014
Scope of work: Project verification
Performed services:
Phase 1. Verification of EWRP detailed design documents.
- Review drawings and other deliverables formats on compliance to RoK standards (SPDS and other) with subsequent issuing of punch list.
- Review & commenting of the drawings by disciplines (civil, mechanical, electrical, instrumentation, HSE, process) on compliance to RoK rules.
- Checking of calculations methods and software applications used by WPK in order to identify their applicability in RoK.
- Review the materials and equipment used in the detailed design in order to verify their compliance for using in RoK.
- Check detailed design package on compliance with approved EWRP TPD.
- Check all drawings and other documents that will form handover package and will be provided to authorities during commissioning stages (F&G schemes, cause & effects, HVAC calculations and passports, potable water systems calculations etc.
Phase 2. Verification of EWRP TPD amendment.
- Review of explanatory and issuing comments with anticipation of possible comments from authorities.
- Review of drawings package and issuing comments with anticipation of possible comments from authorities.
_____________________________________________________________________________________________
Customer: Atyrau Branch of “ENKA Insaat ve Sanayi Anonim Sirketi”
Project: “Technical documentation development for geodynamic subsoil monitoring station on D, A, DC-01, DC-04, DC-05 of the Kashagan Field”
Work performance period: 01.06.2012-21.09.2012
Scope of work: Engineering services, getting approvals, technical and author’s supervision services.
Performed services:
- Front end engineering design.
- Detail design development.
- Emergency department of Atyrau oblast;
- Sanitary Epidemiological Supervision of Atyrau oblast;
- Zhaik Caspiy department of ecology;
- State Ecology expert conclusion obtaining on the EIA part; SES conclusion for the EIA part.
- Author’s supervision.
________________________________________________________________________________________________________
Customer: “Kvaerner Caspian Engineering” LLP
Work performance period: 27.08.2012 – up to the present moment
Scope of work: Checking drawings on electric discipline.
Performed services:
Checking for compliance with RoK SNIP and PUE requirements.
________________________________________________________________________________________________________
Customer: JSC “National technical-scientific centre of Industrial Safety” MES of RoK
Project: Helicopter refueling station on helideck “Zhuldyz”on the EPC-4 artificial Island. Kashagan field.
Work performance period: 20.11.2012 – 05.12.2012
Scope of work: Carrying out expert examination on special technical terms.
Performed services:
Carrying out expert examination on special technical terms and issue industrial safety expert conclusion.
________________________________________________________________________________________________________
Customer: Consolidated Contracting Engineering & Procurement S.A.L
Project: Future Growth Project 3rd Generation plant TCO\KPJV
Work performance period: 30.07.2014-20.03.2015
Scope of work: “Temporary camp for 2000 places” Tengiz field
Performed services:
1. Receiving of architectural and planning tasks issued by Department of Architecture and Urban Planning in Zhyloi;
2. Development of the project;
3. Approval of the following supervisory bodies:
– Department of Consumer Protection in Atyrau region;
– Department of Natural Resources and Environmental Control in Atyrau region.
3. Receiving of the positive conclusion of the private examination of the working draft
Project: Future Growth Project 3rd Generation plant TCO\KPJV
Work performance period: 09.12.2014- 21.08.2015
Scope of work: «Laydown area at 3GP side»
Performed services:
1. Development of the project;
2. Approval of the following supervisory bodies:
– Department of Consumer Protection in Atyrau region;
– Department of Natural Resources and Environmental Control in Atyrau region.
3. Receiving of the positive conclusion of the private examination of the working draft
Project: Future Growth Project 3rd Generation plant TCO\KPJV
Work performance period: 09.12.2014- up to present time
Scope of work: «Temporary structure on the construction site»
Performed services:
1. Development of the project;
2. Approval of the following supervisory bodies:
– Department of Consumer Protection in Atyrau region;
– Department of Natural Resources and Environmental Control in Atyrau region.
3. Receiving of the conclusion of the private examination of the working draft
________________________________________________________________________________________________________
Customer: «Direct Construction Service» LLP
Project: House building plant of Direct Construction Service LLP in Atyrau city
Work performance period: 06.01.2014 – 26.06.2014
Scope of work: Engineering services, getting approvals, technical and author’s supervision services
Performed services:
-Front end angineering design.
-Detail design development.
–Author’s supervision.
________________________________________________________________________________________________________
Customer: SINOPEC Engineering(Group)Co., Ltd
Project: Complex construction project on aromatic hydrocarbons production in Atyrau oil refinery
Work performance period: 08.10.2014г.-22.10.2014г.
Scope of work: Obtaining a permit for using equipment to 10 units
Performed services:
1.Documentation preparation
2. Obtaining a permits to use in RoK regulatory authority
Scope of work: Obtaining a permit for using equipment to 21 units
Work performance period: 23.07.2014г.-30.07.2014г.
Performed services:
1.Documentation preparation
2. Obtaining a permits to use in RoK regulatory authority
Scope of work: Obtaining a permit for using equipment to 4 units
Work performance period: 01.09.2014г.-15.09.2014г.
Performed services:
1.Documentation preparation
2. Obtaining a permits to use in RoK regulatory authority
Scope of work: Obtaining a permit for using equipment to 6 units
Work performance period: 19.09.2014г.-03.10.2014г.
Performed services:
1.Documentation preparation
2. Obtaining a permits to use in RoK regulatory authority
Scope of work: Obtaining a permit for using equipment to 11 units
Work performance period: 30.04.2014-12 work days
Performed services:
1.Documentation preparation
2. Obtaining a permits to use in RoK regulatory authority
Scope of work: Obtaining a permit for using equipment to 23 units
Work performance period: 05.09.2014г.-12.09.2014г
Performed services:
1.Documentation preparation
2. Obtaining a permits to use in RoK regulatory authority