“Zheruyik Residential Complex” consisting of five-storey, 25-apartment residential buildings

  • “Zheruyik Residential Complex” consisting of five-storey, 25-apartment residential buildings

Client: ABE & K LLP

Project: “Zheruyik Residential Complex” consisting of five-storey, 25-apartment residential buildings

Project Duration: 12.2015 — present

Scope of Work: Project development and approval.

Services Provided:

  1. Pre-design activities.

  2. Development of the detailed (working) design.

  3. Obtaining a positive conclusion from the State Expert Review.

  4. Coordination of technical design documentation with the following relevant government authorities:

    • Atyrau Regional Department for Emergency Situations;

    • Atyrau Regional Sanitary and Epidemiological Supervision Department;

    • Department of Ecology.

  5. Obtaining a construction permit from the local authority.

Project:
“Arrangement of the Kashagan Field during Pilot Industrial Development. Onshore Facilities. UOPFG. Temporary Emergency Helipads; Internal Roads; Temporary Personnel Shelters; Road Lighting at UOPFG”;
“Arrangement of the Kashagan Field during Pilot Industrial Development. Agip KCO Camp. 35/10 kV Transformer Substation of the Engineering Support Zone”

Project Duration: 15.03.2010 — 31.12.2010

Scope of Work:

  • Development and adaptation of the detailed design.

  • Coordination of technical design documentation with government authorities.

  • Analysis of existing design documentation for the pre-plant area.

Services Provided:

  • Development and adaptation of the detailed design.

  • Obtaining a positive conclusion from the State Expert Review.

  • Coordination of technical design documentation with the following relevant government authorities:

    • Atyrau Regional Department for Emergency Situations;

    • Atyrau Regional Sanitary and Epidemiological Supervision Department;

    • Zhaiyk–Caspian Department of Ecology.

Project: “Temporary Offices of Agip KCO TSO 5, 6” and “Temporary Office of Agip KCO TSO 7”

Project Duration: 18.08.2010 — 01.03.2011

Scope of Work: Development of the detailed design and coordination with government authorities.

Services Provided:

  1. Development of the detailed design.

  2. Obtaining a positive conclusion from the State Expert Review.

  3. Coordination of technical design documentation with the following relevant government authorities:

    • Atyrau Regional Department for Emergency Situations;

    • Atyrau Regional Sanitary and Epidemiological Supervision Department;

    • Zhaiyk–Caspian Department of Ecology.

  4. Obtaining a construction permit from the local State Architectural and Construction Control Authority.

Project: “Re-injection of Drilling Cuttings on EPC-3 Island”

Project Duration: 01.10.2010 — 28.02.2011

Scope of Work: Consulting services and project approval.

Services Provided:

  • Provision of consulting services.

  • Coordination of the project with relevant government authorities.

  • Author supervision.

Project: “Temporary Offices of Agip KCO TSO 8, 10” and “Temporary Office of Agip KCO TSO 9”

Project Duration: 13.01.2011 — 13.04.2011

Scope of Work: Project development and approval.

Services Provided:

  1. Pre-design activities.

  2. Development of the detailed design.

  3. Obtaining a positive conclusion from the State Expert Review.

  4. Coordination of technical design documentation with the following relevant government authorities:

    • Atyrau Regional Department for Emergency Situations;

    • Atyrau Regional Sanitary and Epidemiological Supervision Department;

    • Zhaiyk–Caspian Department of Ecology.

  5. Obtaining a construction permit from the local State Architectural and Construction Control Authority.

Project: “Revision of the Bautino Base Project. Collection of Baseline Data for the EIA Section”

Project Duration: 05.04.2011 — 30.06.2011

Scope of Work: Project revision and collection of baseline data for the EIA section.

Services Provided:

  • Project revision.

  • Collection of baseline data for the Environmental Impact Assessment (EIA) section.

Project: “Revision of the Koshanay Project. Collection of Baseline Data for the EIA Section”

Project Duration: 05.04.2011 — 30.06.2011

Scope of Work: Project revision and collection of baseline data.

Services Provided:

  • Revision of the Koshanay project.

  • Collection of baseline data for the Environmental Impact Assessment (EIA) section.

Project: “Revision of the Agip KCO Training Center Project. Collection of Baseline Data for the EIA Section”

Project Duration: 05.04.2011 — 30.06.2011

Scope of Work: Project revision and collection of baseline data for the EIA section.

Services Provided:

  • Revision of the Agip KCO Training Center project.

  • Collection of baseline data for the Environmental Impact Assessment (EIA) section.

Project:
“Helicopter Refueling Station at Helipad ‘KE-F’, located on Artificial Island ‘Island A’ (Kashagan Field)”

Project Duration: 30.06.2011 — 31.08.2011

Scope of Work: Design services, permitting, coordination, technical supervision, and author supervision.

Services Provided:

  1. Pre-design activities.

  2. Development of the detailed design.

  3. Obtaining a positive conclusion from the State Expert Review.

  4. Coordination of technical design documentation with the following relevant government authorities:

    • Atyrau Regional Department for Emergency Situations;

    • Atyrau Regional Sanitary and Epidemiological Supervision Department;

    • Zhaiyk–Caspian Department of Ecology.

  5. Obtaining a construction permit from the local State Architectural and Construction Control Authority.

  6. Technical supervision.

  7. Author supervision.

Project: “Development of the Detailed Design for Preparation of an Undeveloped Area of the Agip KCO Bautino Base”

Project Duration: 03.02.2012 — 13.02.2012

Scope of Work: Project development and approval.

Services Provided:

  • Pre-design activities.

  • Development of the detailed design.

  • Coordination of technical design documentation with the following government authorities:

    • Atyrau Regional Sanitary and Epidemiological Supervision Department;

    • Zhaiyk–Caspian Department of Ecology.

Project: “Administrative Building of DCS LLP with Parking Facility”

Project Duration: 18.01.2012 — 13.09.2012

Scope of Work: Design, permitting, coordination, technical supervision, and author supervision services.

Services Provided:

  1. Pre-design activities.

  2. Development of the detailed design.

  3. Obtaining a positive conclusion from the State Expert Review.

  4. Coordination of project documentation with the following relevant government authorities:

    • Atyrau Regional Department for Emergency Situations;

    • Atyrau Regional Sanitary and Epidemiological Supervision Department.

  5. Technical supervision.

  6. Author supervision.

Project:
“Helicopter Refueling Station at Helipad ‘Zhuldyz’, located on Artificial Island ‘EPC-4’ (Kashagan Field)”

Project Duration: 05.10.2012 — 08.01.2013

Scope of Work: Design, permitting, coordination, technical supervision, and author supervision services.

Services Provided:

  1. Project development.

  2. Obtaining a positive conclusion from the State Expert Review.

  3. Coordination of project documentation with the following relevant government authorities:

    • State Architectural and Construction Control Authority (GASK);

    • Atyrau Regional Department for Emergency Situations;

    • Atyrau Regional Sanitary and Epidemiological Supervision Department;

    • Department of Ecology.

  4. Obtaining a construction permit.

  5. Technical supervision.

  6. Author supervision.

Category: Projects