Client: Kvaerner Caspian Engineering LLP
Project Duration: 27.08.2012 — present
Scope of Work:
Review of electrical discipline drawings for compliance with applicable SNiP and PUE requirements of the Republic of Kazakhstan.
Services Provided:
- Verification of electrical discipline drawings for compliance with the requirements of SNiP and PUE of the Republic of Kazakhstan for facilities / well-related components, including:
- 0.4 kV underground power supply cable from the existing transformer to the new distribution board;
- Internal power distribution within the Telemetry Block (TB), with integration into the control system and UPS system located at the well site;
- Cathodic protection system for pipelines;
- Heat tracing system for the above-ground sections of pipelines;
- External lighting system for the well site;
- Grounding (earthing) system diagram.