Development Project for Pilot Industrial Facilities of the Kashagan Field

  • Development Project for Pilot Industrial Facilities of the Kashagan Field

Client: Agip KCO

Project:
“Development Project for Pilot Industrial Facilities of the Kashagan Field”

Project Duration: 16.11.2011 — 05.12.2011

Scope of Work:
Inspection and expert assessment of a methanol dosing tank for its use as temporary methanol storage during commissioning works at the UOPFG.

Services Provided:

  • Preparation of recommendations for the use of the dosing tank as a temporary methanol storage facility.

  • Conducting an industrial safety expert review and issuance of an expert conclusion.

  • Verification of compliance with the norms and regulations of the Republic of Kazakhstan.

  • Obtaining the required permitting documentation.

Project:
“Development Project for Pilot Industrial Facilities of the Kashagan Field”

Project Duration: 21.11.2011 — 21.12.2011

Scope of Work:
Development of regulations for the gas service and organization of departmental control over the safe operation of gas facilities in accordance with industrial safety requirements for natural gas distribution and consumption systems. Obtaining licenses.

Services Provided:

  • Conducting an industrial safety expert review and issuance of an expert conclusion.

  • Obtaining licenses for the following activities:

    • Operation, maintenance, and servicing of external gas supply systems (gas distribution stations, gas distribution units, high-, medium-, and low-pressure gas distribution networks).

    • Operation, maintenance, and servicing of internal gas networks, gas appliances, and equipment.

Project:
“Development Project for Pilot Industrial Facilities of the Kashagan Field”

Project Duration: 09.01.2012 — 09.02.2012

Scope of Work:
Obtaining a permit for use of sheet pile walls and round piles.

Services Provided:

  • Preparation of documentation.

  • Issuance of an expert conclusion and obtaining a permit for use in the field of industrial safety.

Project:
“Development Project for Pilot Industrial Facilities of the Kashagan Field”

Project Duration: 01.08.2012 — 02.10.2012

Scope of Work:
Obtaining a permit for application of the technology “Nitrogen/Helium Leak Testing with a duration of 1 hour”.

Services Provided:

  • Collection, compilation, and preparation of documentation.

  • Conducting an industrial safety expert review and issuance of an expert conclusion.

  • Obtaining a permit for application from the Ministry for Emergency Situations of the Republic of Kazakhstan.

Project:
“Development Project for Pilot Industrial Facilities of the Kashagan Field”

Project Duration: 01.01.2012 — 31.08.2012

Scope of Work:
Preparation of as-built (executive) documentation.

Services Provided:

  • Development of detailed matrices and registers for as-built documentation for the offshore complex.

  • Maintenance and documentation of operational control over construction and installation works.

  • Execution and documentation of inspections of concealed works and interim acceptance of critical structures and equipment in accordance with the procedures and scope defined by the design documentation.

  • Preparation of documentation packages for offshore facilities required for submission for commissioning.

  • Compliance with the requirements of local executive authorities for handover and acceptance documentation.

  • Compilation of as-built documentation dossiers by subsystems for submission to the State Acceptance Commission.

Project:
“Development Project for Pilot Industrial Facilities of the Kashagan Field. Western Eskene Railway Complex. Sulfur Granulation and Loading Complex. Book 1”

Project Duration: 20.02.2012 — 20.05.2012

Scope of Work:
Review of design documentation (Design Stage “P”), including the explanatory note, project sections, and all drawings. Consulting support during the project approval process.

Services Provided:

  • Review of design documentation (explanatory note, project sections, all drawings).

  • Issuance of comments on the project documentation.

  • Consulting support during the project approval process.

  • Obtaining a temporary permit for preparatory and earthworks.

Project:
“Development Project for Pilot Industrial Facilities of the Kashagan Field. Onshore Complex. UOPFG. Addendum. Mercury Removal Unit”

Project Duration: 08.08.2012 — 08.12.2012

Scope of Work:
Development of technical design documentation for the mercury removal unit and coordination with relevant state authorities.

Services Provided:

  1. Pre-design activities.

  2. Development of technical design documentation.

  3. Coordination of technical design documentation with the following government authorities:

    • Atyrau Regional Sanitary and Epidemiological Supervision Department;

    • Zhaiyk–Caspian Department of Ecology;

    • Atyrau Regional Department for Emergency Situations (Industrial Safety).

  4. Obtaining a positive conclusion of the State Expert Review from RSE “Gosexpertiza”, Astana.

Project:
“Development Project for the Kashagan Field. Onshore Complex. Unit 620. Addendum (Transition Plan to Closed-Loop Water Supply, Phase 1)”

Project Duration: 22.04.2013 — 23.05.2013

Scope of Work:
Assessment and justification of the project in the field of industrial safety.

Project:
“1,000-Person Shift Camp at Western Eskene”

Project Duration: 27.03.2013 — 28.06.2013 (Not completed)

Scope of Work:
Project revision.

Services Provided:

  • Project revision with all required surveys, obtaining permits from relevant authorities, and obtaining a State Expert Review conclusion.

Project:
Expert review of power supply systems and obtaining permanent connection permits to existing electrical networks for the following projects: UOPFG Tranches 1, 2, and 3; PRZTO; Sulfur Storage Facility; Export Oil Pipeline; Export Gas Pipeline; Field Pipelines; Fuel Gas Pipeline; Chemical Laboratory.

Project Duration: 30.04.2013 — 30.06.2013 (Not completed)

Scope of Work:
Expert review of power supply systems and obtaining approvals from relevant authorities.

Project:
Author supervision of construction of production wells at EPC-4 Island, Kashagan Field, Wells WK 04-01 to WK 04-07.

Project Duration: 01.07.2013 — 31.12.2013

Scope of Work:
Provision of Author Supervision.

Project:
“Western Eskene Railway Complex Project”

Project Duration: 01.07.2013 — 31.01.2014

Scope of Work:
Project review.

Services Provided:

Stage 1: Review of Working Documentation for the Western Eskene Railway Complex

  • Review of drawing formats and documentation for compliance with RK standards (construction, design, and estimate documentation), including issuance of a defect list.

  • Review of drawings by discipline (civil, mechanical, electrical, instrumentation & control, HVAC, environmental protection, process) for compliance with RK regulations.

  • Review of calculation methods and software used by WorleyParsons Kazakhstan to assess applicability in the Republic of Kazakhstan.

  • Review of materials and equipment specified in the working documentation to confirm suitability for use in the Republic of Kazakhstan.

  • Verification of compliance of the working documentation package with the approved technical design documentation.

  • Review of all drawings and documents included in the handover package to be submitted to state authorities during commissioning (P&IDs, cause-and-effect diagrams, HVAC calculations and data sheets, potable water system calculations, etc.).

Stage 2: Review of Amendments to the Technical Design Documentation

  • Review of comments received during clarification and document preparation to anticipate potential remarks from state authorities.

  • Review of drawing packages and received comments to anticipate potential remarks from state authorities.